Service description

Rainwater System Pipeline Engineering Project in Ningshan Road, Huanggu District

The project is located on both sides of Ningshan Road in Huanggu District. It belongs to a downtown area and is close to the government of Huanggu District.There are five renovation projects of rainwater pipelines on roads, including Liaohe Street, Bailongjiang Street, Heilongjiang Street, Songhuajiang East Street and Songhuajiang Street.The pipes are made of sand sandwiched GRP(glass fiber reinforced plastics) pipes with diameters of 1 m, 1.2 m and 1.5 m respectively. The total length of construction pipeline is 3844 meters.

 

Drainage Channel Engineering Project

The project is located along the South Canal, the Weigong Open Canal and the Xinkai River in Shenyang.The standard of existing rainwater facilities is low, and it is difficult for existing facilities to empty rainwater in time when heavy rains occur. In the 13KM area along the South Canal, 52 outlet channels were constructed; in the 6KM area along the Weigong Open Canal, 52 outlet channels were constructed; and in the 15KM area along the Xinkai River, 15 outlet channels were constructed.A total of 119 drainage channels are located to improve drainage capacity in rainy season.

 

The flood control and drainage project was established in October 2017, and entered the construction site on March 10, 2018. It was successfully completed on June 30, 2018, and was highly recognized by the owners.