Water Tower Project in Olembé, Yaoundé
Name: Water Tower Project in Olembé,Yaoundé
Duration: 6 months
Owner: Cameroon Housing Department
Commencement Date: 7th, June, 2018
Location: 1500 Social Housing Project Olembé Park in Yaoundé
Contents: The project contains two parts, water tower and pool. The water tower is buried 2.3 meters underground, 22.5 meters above ground, with18 meterstower column, 4.5 meters tower top flume, 72 cubic meters of water storage in the tank; the water pool is located underground, with 3.4 meters deep, 180 cubic meters of water storage; and the pump room is 13.5 square meters.